Traffic Analysis & Optimization
Traffic Pattern & Optimization of VT Equipment in various types of Buildings
JP Elevator Consultants will evaluate the Building requirements, Traffic flow patterns, Type of Tenants, Location of Public facilities such as Restaurants, Coffee shops, Sports facilities etc., in the building and develop a applicable pattern for the Traffic flow during Up Peak, Down Peak and Two- way traffic in the building for optimizing the Vertical and Horizontal Transpotaion equipment such as Elevatos, Escalators, Trae-o-lators and Dumb waiters.
This initial analysis of Traffic Flow and requirement for VT equipment will avoid any major issues of incorrect hoistway(s) or Shafts for efficient flow of Traffic in buildings.
Existing Building Projects
If you are starting a project for a new or existing building we have the experience to assist you in the conceptual stages. We will assist you to optimize the Hoistway, Pit and Overhead Dimensions, and to find the most cost effective equipment for your project.
We will compare the equipment limitations from different elevator manufacturers and help you make the right choice.
We will provide cost effective solutions to upgrade equipment on the existing buildings which will improve the efficiency and improve aesthetics of the fixtures and the cabs.
Typically the equipment in the Machine Room, Hoistway / Shaft and the Pit can be upgraded to avoid Product failures and increase safety of the passengers.
The newer Controllers in the Machine Room occupy almost 50% space and are more efficient in power consumption. These controllers use regenerative power to supply auxiliary power to the building.
Modernization
Equipment installed in building over 20 years old should be modernized to reduce operation costs, improve performance and incorporate building security.
Based on the modern Technology the cost of operating Elevators can be substantially reduced along with space savings.
We can conduct a detailed analysis on what are the best options for achieving these goals and reducing the project costs at the same time.
Project Management
We will propose solution for reducing operating costs of the VT equipment, reduce power consumption and suggest power re-generation equipment.
We have in-depth knowledge of Elevator and Building Codes for North America (USA & Canada), Europe (EU countries and United Kingdom) and Asia (Singapore, Malaysia, Thailand, India and Indonesia) and the Middle East (Saudi Arabia, Israel and UAE).
We can manage projects to reduce the cost of installation. A prime example is leaving holes in the hoistway during concrete pouring for installation of Anchor bolts instead of drilling hundreds or thousands of holes in the concrete.